Required by code
Must be in every quote
- Permit and inspectionThe job includes pulling the permit and passing inspection, not a handshake price with no paperwork.
- Impact-rated windows with a Miami-Dade NOA or Florida Product ApprovalThe quote should name the approval. “Impact glass” with no NOA or Florida Product Approval is not the same line.
- Installed and fastened per the product approval drawingsAnchors, spacing, and substrate follow that product’s drawings, not a generic install.
- Anchored, code-compliant buckThe buck — the frame the window anchors to — has to be the kind the approval allows, and it has to be anchored.
- Exterior sealantThe outside joint between the window and the wall is part of a complete install.
- Removal of old windowsTaking the existing windows out is part of the job, not a surprise add-on after you sign.
- LaborInstallation labor is in the written price, not assumed.
- Debris haul-awayPut haul-away in the quote so the price is complete. This is about what you are paying for. It is not verified here as its own code line.
- Licensed, insured contractorThe company on the quote should be licensed and insured for this trade.
- Egress windows where required (bedrooms)Bedroom openings that the code treats as escape windows have to stay large enough to exit. Ask before a smaller unit goes in.